术语 PERT
释义 PERT
规划评估技术
A critical path analysis using computer techniques. The use of PERT requires an extensive analysis of an overall project in order to list all the individual activities or jobs which must be performed in order to meet the total objective. These activities are then arranged in a network that displays the sequential relationship among them. This analysis must be extremely thorough and detailed if it is to be realistic. PERT provides a means of reporting and analysis for project administrators. Information required can be developed and the areas which impose the greatest time restrictions on the completion of a product can be highlighted. Areas with an excess of time for completion, called stack areas,are also highlighted.
一种使用计算机技术的关键通路分析方法。使用PERT必须对全部方案作广泛的分析,以列出所有独立的活动或 作业,而这些活动或作业必须完成了,才能实现总的任务。于是,这些活动构成一个网络, 该网络显示了各个活动之间的顺序关系。这种分析必须是极其彻底的、详尽的,才能使 其成为现实可行的。PERT为计划管理人员提供了叙述和分析计划的方法,所需的信息可以产 生出来,而且在完成任务时对时间限制影响最严重的部分可以明显显示出来,完成任务的时间有 富余的部分(称为堆积部分)也可以明显显示出来。Program Evaluation and Review Technique的 缩写。
参阅critical path method。
随便看

 

计算机英汉双解词典包含21137条计算机术语英汉翻译词条,基本涵盖了全部常用计算机术语的翻译及用法,是计算机学习及翻译工作的有利工具。

 

Copyright © 2004-2023 Winrtm.com All Rights Reserved
京ICP备2021023879号-40 更新时间:2024/10/6 10:34:50